Roxy Cinema Dubai Hills Mall

Delivering an unparalleled cinematic experience with the biggest screen in the region

Introduction

Operated by Roxy Cinemas inside Dubai Hills Mall, ISG Middle East delivered this grand scale cinema project covering a total area of 101,000 square feet across three floors. The cinema hosts a total of 15 cinematic screens and 1183 seats.

The star attraction is “Roxy Xtreme” located on the first floor – UAE’s largest cinema screen measuring 28m by 15.1m, and equipped with state-of-the-art laser projection and DOLBY ATMOS sound. “Roxy Xtreme” opens its doors to the public on Wednesday, 31 August 2022.

Besides “Roxy Xtreme”, its star attraction and biggest screen with it being the size of two tennis courts at 423sqm, the new Roxy Cinemas at Dubai Hills Mall also features heated seats, a licensed bar and a “Hall of Fame” where stars who visit will have their hand or footprints immortalised.

Customer Dubai Holding Entertainment
Project Manager North 25
ME Engineer Bluehaus Group
Procurement Route Traditional
Area 100,000 sq ft
Completion Date August 26th 2022
Program Duration 241 Days
Quantity Surveyor JLL
Architect Bluehaus Group
Structural Engineer ASG
Form Of Contract Bespoke – Lump Sum Fixed Price

Adding value every step of the way

In a unique approach to giving back, ISG Middle East launched its first site-based donation drive where over 90 workers working on the site had access to pre-owned outfits.

Engaging with different stakeholders across all areas of the business to ensure it brings the client’s vision to life at every stage of the fit out. The project’s relationship driven approach has seen ISG Middle East working directly with the client on every aspect of the design and build.

The project

ISG Middle East’s scope of works includes, structural steel works for stadia seating platforms, projection platforms and suspended corridors, acoustic treatment inside the cinemas for wall panels, ceiling tiles; acoustic/floating floors and carpets, joinery including doors, concession and ticket counters’ paneling and bespoke seating, cinema-grade acoustic gypsum partition systems, vertical transportation including four escalators, three lifts, loose furniture, signage, screed works and kitchen equipment for all F&B counter services, lighting, MEP and IT/security.

“ISG has gone above and beyond expectations and really helped in any way to get the project delivered on time, this care is something that isn’t often seen from a contractor.
We would like to work with ISG again on future refurbishment
works for Roxy.”

Erik Stevens and Anna Gioarsa, Roxy/Dubai Holding Entertainment

Watch the making of “Roxy Xtreme”– the MENA region’s largest cinema screen delivered by ISG

The first floor has seven luxurious silver auditoriums along with two fully equipped kitchens, food and beverage counters, and the main access to Roxy Xtreme, offering an abundance of options for moviegoers.

Timber cladding was used on corridor walls, complimenting a blend of green carpet and black/white terrazzo tile flooring, giving a warm, outdoorsy feel to the space, inviting you to a cosy cinematic experience inside the cinema rooms.

The ground floor features ticketing counters hand-crafted with decorative Italian mosaics, back offices, digital display walls and self-serving kiosks with a with a grand staircase spanning across all 3 levels as well as escalators and lifts, which were installed in a live, fully operating mall environment

Challenges

  • There were logistics constraints for the delivery and installation of 360 tons of hot rolled steel which had to be delivered in live mall environment with limited access points.
  • The installation of 20m high partitions, without using large access equipment due to logistics constraints of no large machines allowed onsite.
  • Optimising co-ordination with several client direct suppliers providing key installations including seating, TMS, screens, audio systems and digital screens.

What we did

  • ISG Middle East implemented a robust plan using multiple spider cranes to maneuver the steel into the space and install in line with the program durations during hours permitted by client and landlord.
  • ISG Middle East staged scaffolding with long-term foresight to allow for efficient modification to allow partitions to be built, while having other works such as steel installation proceed in tandem.
  • ISG Middle East arranged and coordinated robust coordination meetings bringing all key stakeholders to ensure a smooth and seamless delivery. The ISG team also continuously used transparent and open communication to build strong relationships with all stakeholders.

News & Insights

Latest from ISG Middle East

Could appropriate space be the key to resolving our productivity conundrum in the UAE?

ISG Middle East - Madinat Jumeirah Mina Al Salam Royal Suite Living Area 2

Newly refurbished Jumeirah Mina A’Salam Hotel Embodies the Spirit of Arabian Hospitality

The Pivotal Role of Governance in Sustaining Business and Mitigating Risks

ISG Middle East has completed a state-of-the-art workspace project for Roland Berger.