Federal Tax Authority
Transformation of the UAE Federal Tax Authority at the Central Park Office Tower in DIFC
Introduction
ISG Middle East provided the UAE Federal Tax Authority with technical design and fit out services for its 60,000 sq ft Dubai office located at the Central Park Office Tower found within the Dubai International Financial Centre (DIFC).
For this project, our scope included the design and build of three office levels, design development, detailing, and engineering design of all electrical and mechanical systems.
| Customer | Federal Tax Authority |
| Project Manager | Cambridge Design + Build |
| Architect | Cambridge Design + Build |
| Area | 60,000 sq ft |
| Completion Date | August 2018 |
| Program Duration | 20 Weeks |
Adding value every step of the way
In a unique approach to giving back, ISG Middle East launched its first site-based donation drive where over 90 workers working on the site had access to pre-owned outfits.
Engaging with different stakeholders across all areas of the business to ensure it brings the client’s vision to life at every stage of the fit out. The project’s relationship driven approach has seen ISG Middle East working directly with the client on every aspect of the design and build.
The project
The chic office design features a neutral colour palette and interiors, which was brought to life by a careful choice of rich materials and finishes. The muted interiors are accented by striking and eclectic lighting fixtures and living green walls, which make a breathtaking statement, and create an alluring and inviting office environment.

ISG Middle East faced some challenges relating to the lengthy process of materials signoff, since design details were developed, while ISG team had already deployed to project site, which led to some delays in the delivery of finishing materials and furniture.
ISG Middle East had to re-sequence the fit out rogramme to absorb the delays and allocated additional manpower, supervision and management resources to the final project stage to ensure that the project was completed on time.